-
Supplying and Installation complete
Instrumentation and control panel for small
refinery.
-
Supplying and Installation tank gauge level
system
-
Calibration tank Prover 5000 Liter with
mobile trailer.
-
Supply master meter on mobile trailer.
-
Bench test and measure. - BASRA Sport City water treatment project Our Job was supply, Installation and commissioning Switch gear 11kv, MCC panel, complete PLC and all instrumentation. all items was from ABB and Bopp and Reuther. - Supply two Bench and test equipments from Time electronics to State company for Fertilize / South Region. - Supply Complete Tank gauge system ( 8 level gauge) from Motherwell/UK to Missan depot.

|